IG Relay2 (Push Button Start): Installation
CAUTION:
Before handling the airbag system components, refer to "CAUTION" of "General Description" in "AIRBAG SYSTEM". <Ref. to
CAUTION
, General Description.>
- Install the IG relay 2 (push button start).
- Install the relay & fuse box and fuse holder.
Tightening torque:
Relay & fuse box: 7.5 N.m (0.8 kgf-m, 5.5 ft-lb)
- Install the knee airbag module.
Tightening torque:
7.5 N.m (0.8 kgf-m, 5.5 ft-lb)
- Install the cover assembly - instrument panel LWR driver.
- Connect the battery ground terminal. <Ref. to BATTERY , NOTE, Note.>