LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2014 >> Outback 2.5i, Automatic CVT Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 20 (Fuel Injection Fuel Systems (H4DO)) >> Tumble Generator Valve Assembly >> Inspection >> Check Motor

Check Motor

WARNING: This page is about a different car, the 2014 Subaru Forester. However, it is still accessible from the selected car via links, so may be relevant.
  1. Connect the battery positive terminal to terminal No. 5 and the battery ground terminal to terminal No. 4, and check that the valve is fully opened on LH side and the valve is fully closed on RH side.
    CAUTION: Do not power the motor for more than 10 seconds.
    Fig 1: Connecting Battery Positive Terminal To Terminal No. 5 And Battery Ground Terminal To Terminal No. 4
    G09475570Courtesy of SUBARU OF AMERICA, INC.
  2. Connect the battery positive terminal to terminal No. 4 and the battery ground terminal to terminal No. 5, and check that the valve is fully closed on LH side and the valve is fully opened on RH side.
    CAUTION: Do not power the motor for more than 10 seconds.
    Fig 2: Connecting Battery Positive Terminal To Terminal No. 4 And Battery Ground Terminal To Terminal No. 5
    G09475571Courtesy of SUBARU OF AMERICA, INC.