DTC P2402 Evaporative Emission System Leak Detection Pump Control Circuit High: Wiring Diagram
- Engine electrical system, 2.5 L model (without push button start). See appropriate SYSTEM WIRING DIAGRAM article.
- Engine electrical system, 2.5 L model (with push button start). See appropriate SYSTEM WIRING DIAGRAM article.
DIAGNOSTIC PROCEDURE
| Step | Check | Yes | No |
|---|---|---|---|
1 CHECK HARNESS BETWEEN ECM AND LEAK CHECK VALVE ASSEMBLY CONNECTOR.
|
Is the voltage 10 V or more? | Repair the short circuit to power in harness between ECM and leak check valve assembly connector. | Go to step 2 . |
2 CHECK LEAK CHECK VALVE ASSEMBLY.
|
Is the vacuum pump of the leak check valve assembly OK? | Repair the poor contact in the leak check valve assembly connector. | Replace the leak check valve assembly. Refer to LEAK CHECK VALVE ASSEMBLY . |