LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2013 >> BRZ Limited, Automatic Trans >> Repair and Diagnosis >> Electrical >> Charging Systems >> Alternator (FA20) >> Reassembly >> Installation

Alternator (FA20): Reassembly: Installation

  1. Install the alternator ASSY.
    1. Install the alternator ASSY in place with the two bolts.

      Standard value: T=25N.m {255kgf.cm} {18.4ft.lbf}

    2. Connect the connector.
    3. Connect the wiring harness to the B terminal with a nut.

      Standard value: T=16N.m {163kgf.cm} {11.8ft.lbf}

    4. Install the terminal cap.
  2. Install the fan and alternator V-belt.

    (Refer to INSTALLATION )

  3. Connection of the battery ground terminal

    Standard value: T=6.0N.m {61kgf.cm} {4.4 ft.lbf}