LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2011 >> Outback R >> Repair and Diagnosis >> External Pages >> Different car >> Section 95 (Starting/Charging Systems (H4SO)) >> Battery >> Installation

Section 95 (Starting/Charging Systems (H4SO)): Battery: Installation

WARNING: This page is about a different car, the 2012 Subaru Outback and 2012 Subaru Legacy. However, it is still accessible from the selected car via links, so may be relevant.

Install in the reverse order of removal.

Tightening torque: 

3.5 N.m (0.4 kgf-m, 2.6 ft-lb) 

NOTE:
  • Clean the battery cable terminals and apply grease to retard the formation of corrosion.
  • Connect the battery positive (+) terminal, and then connect the negative (-) terminal.
  • After the battery is installed, initial diagnosis of the electronic throttle control is performed. Wait for 10 seconds or more after turning the ignition switch to ON, and then start the engine.