AT Shift Lock Solenoid and "P" Range Switch: Inspection
DIAGNOSIS PROCEDURE CHART
| Step | Check | Yes | No |
|---|---|---|---|
| 1 CHECK SHIFT LOCK SOLENOID. Measure the resistance of shift lock solenoid connector terminals. Terminals No. 4 - No. 3: |
Is the resistance between 19.8 - 24.2 Ω? | Go to step 2 . | Replace the shift lock solenoid. |
| 2 CHECK SHIFT LOCK SOLENOID. Connect the battery to shift lock solenoid connector terminal, and then operate the solenoid. Terminals No. 3 (+) - No. 4 (-): |
Does the shift lock solenoid operate normally? | Go to step 3 . | Replace the shift lock solenoid. |
3 CHECK "P" RANGE SWITCH.
|
Is the resistance less than 1 Ω? | Go to step 4 . | Replace the "P" range switch. |
4 CHECK "P" RANGE SWITCH.
|
Is the resistance 1 MΩ or more? | Normal | Replace the "P" range switch. |