AT Shift Lock Solenoid and "P" Range Switch: Inspection
DIAGNOSIS PROCEDURE
| Step | Check | Yes | No |
|---|---|---|---|
| 1 CHECK SHIFT LOCK SOLENOID. Measure the resistance of shift lock solenoid connector terminals. Terminals No. 4 - No. 3: |
Is the resistance between 12 and 18 Ω? | Go to step 2. | Replace the shift lock solenoid. |
| 2 CHECK SHIFT LOCK SOLENOID. Connect the battery to shift lock solenoid connector terminal, and then operate the solenoid. Terminals No. 3 (+) - No. 4 (-): |
Does the shift lock solenoid operate normally? | Go to step 3. | Replace the shift lock solenoid. |
3 CHECK "P" RANGE SWITCH.
Terminals No. 1 - No. 2: |
Is the resistance less than 1 Ω? | Go to step 4. | Replace the "P" range switch. |
4 CHECK "P" RANGE SWITCH.
Terminals No. 1 - No. 2: |
Is the resistance more than 1 MΩ? | Normal operation | Replace the "P" range switch. |