LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2005 >> Baja Base, Standard >> Repair and Diagnosis >> Electrical >> Gauges >> Instrumentation/Driver Info >> Combination Meter Assembly >> Removal

Combination Meter Assembly: Removal

  1. Disconnect ground cable from battery.
  2. Set tilt steering at the lowest position.
  3. Disconnect each electrical connector to remove front cover (A) and switch panel (B).
  4. Loosen screws (C) to remove center panel (D).
  5. Remove meter visor (E).
    Fig 1: Removing Front Cover, Switch Panel, Center Panel And Meter Visor
    G03752392Courtesy of SUBARU OF AMERICA, INC.
  6. Remove screws of combination meter to pull out the meter toward you.
  7. Remove connector in the upper area of combination meter to remove meter.
    Fig 2: Removing Combination Meter Assembly Screws
    G03752393Courtesy of SUBARU OF AMERICA, INC.
    CAUTION:
    • Be careful not to damage meter or instrument panel.
    • Pay particular attention to avoid damaging the meter glass.