LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2005 >> Baja Base, Automatic >> Repair and Diagnosis >> Drivelines & Axles >> Wheel Hubs >> Drivetrain System >> Propeller Shaft >> Installation

Propeller Shaft: Installation

  1. Insert sleeve yoke into transmission and attach center bearing to vehicle body.

    Tightening torque: 

    52 N.m (5.3 kgf-m, 38.3 ft-lb) 

    Fig 1: Attaching Center Bearing To Vehicle Body
    G03751605Courtesy of SUBARU OF AMERICA, INC.
  2. Align matching marks and connect flange yoke and rear differential.

    Tightening torque: 

    31 N.m (3.2 kgf-m, 23.1 ft-lb) 

    Fig 2: Aligning Matching Marks And Connecting Flange Yoke And Rear Differential
    G03751606Courtesy of SUBARU OF AMERICA, INC.
  3. Install heat shield cover.
  4. Install center exhaust pipes.
  5. Install rear exhaust pipe and muffler.