LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 1999 >> Impreza RS, Standard >> Repair and Diagnosis >> Accessories & Equipment >> Cruise Control Systems >> System Tests >> Main Switch Test

Main Switch Test

  1. Turn ignition on. Check voltage between fuse No. 18 and ground. Voltage should be 10-13 volts.
  2. Remove main switch and disconnect harness connector. Turn ignition on. Check voltage between ground and main switch harness connector terminal No. 3 (Blue wire). See Fig 1 . Voltage should be 10-13 volts.
  3. To check function of main switch, check resistance between main switch harness connector terminals No. 3 and 5. See Fig 2 . Resistance should be less than 10 ohms with switch on and greater than one megohm with switch off.
  4. To check harness between main switch and control unit, reconnect harness connector. Turn ignition and main switch on. Check voltage by backprobing between specified terminals and ground: Terminals No. 3 (Blue wire) and No. 5 (Green/Blue wire) at main switch harness connector and terminal No. 3 (Blue wire) and No. 4 (Green/Blue wire) at control unit harness connector. Voltage readings should be 10-13 volts. See Fig 3 .
Fig 1: Testing Voltage At Main Switch Harness
G93C84147Courtesy of SUBARU OF AMERICA, INC.
Fig 2: Measuring Resistance In Main Switch
G93D84148Courtesy of SUBARU OF AMERICA, INC.
Fig 3: Checking Harness Between Main Switch & Cruise Control Unit
G93E84149Courtesy of SUBARU OF AMERICA, INC.