Shift-Up Control System: Timer
Make a test circuit as shown in Fig 1. When voltage is applied at terminals 1 and 2, current should be present across test resistor. After 65 seconds, current flow should stop.
CAUTION:
When voltage is applied to terminals 1 and 2, do not connect terminals 2 and 4 directly.