PCV Valve: Installation: Installation
- INSTALL VENTILATION VALVE SUB-ASSEMBLY
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- Apply adhesive to 2 or 3 threads of the ventilation valve.
Adhesive
Part No. 08833-00070, THREE BOND 1342 or equivalent
- Using a 22 mm deep socket wrench, install the ventilation valve.
Torque: 19 N*m ( 194 kgf*cm, 14 in.*lbf)
- Apply adhesive to 2 or 3 threads of the ventilation valve.
- INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY . Refer to INSTALLATION - Step 25
- INSPECT FOR ENGINE OIL LEAK