Auxiliary Emission Control Systems: Canister: Inspection
- INSPECT CANISTER ASSEMBLY
- Visually check the canister for cracks or damage.
If cracks or damage are found, replace the canister assembly.
- Check canister operation.
- While holding the purge port closed, blow 1.67 kPa (17.0 gf/cm2 , 0.24 psi) to the vent port, and check that the air flows from the air inlet port. If the result is not as specified, replace the canister assembly.
- While holding the vent port closed, blow 1.10 kPa (11.2 gf/cm2
, 0.16 psi) to the air inlet port, and check that the air flows from the purge port.
If the result is not as specified, replace the canister assembly.
- Check the air leakage.
- Remove the air hose between ports A and B.
- Connect SST (pressure gauge) to the vent port of the canister.
SST 09992-00242
- While holding port B, the purge port and the air inlet port closed, apply 19.6 kPa (0.2 kgf/cm2
, 2.81 psi) to the vent port, and then confirm that the pressure is retained.
If the result is not as specified, replace the canister assembly.
- Visually check the canister for cracks or damage.