LEMON Manuals: Even more car manuals for everyone
Home >> Scion >> 2008 >> xD Automatic >> Repair and Diagnosis >> Transmission >> Automatic Trans >> U341E Automatic Transaxle >> Valve Body >> Inspection

Valve Body: Inspection

  1. INSPECT SHIFT SOLENOID VALVE S1 
    1. Measure the resistance according to the value(s) in the table below.
      Fig 1: Inspecting Shift Solenoid Valve S1
      G05400378Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Condition Specified Condition
      Solenoid Connector (S1) - Solenoid Body (S1) 15 to 25°C (59 to 77°F) 11 to 15 Ω

      If the value is not as specified, replace the shift solenoid valve S1.

    2. Connect the positive (+) battery lead to the terminal of the solenoid connector, and the negative (-) battery lead to the solenoid body, and check the operation of the valve.
      NOTE: When using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

      OK: 

      The solenoid makes an operating sound. If the operation cannot be done as specified, replace the shift solenoid valve S1. 

  2. INSPECT SHIFT SOLENOID VALVE S2 
    1. Measure the resistance according to the value(s) in the table below.
      Fig 2: Inspecting Shift Solenoid Valve S2
      G05400379Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Condition Specified Condition
      Solenoid Connector (S2) - Solenoid Body (S2) 15 to 25°C (59 to 77°F) 11 to 15 Ω

      If the value is not as specified, replace the shift solenoid valve S2.

    2. Connect the positive (+) battery lead to the terminal of the solenoid connector, and the negative (-) battery lead to the solenoid body, and check the operation of the valve.
      NOTE: When using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

      OK: 

      The solenoid makes an operating sound. If the operation cannot be done as specified, replace the shift solenoid valve S2. 

  3. INSPECT SHIFT SOLENOID VALVE ST 
    1. Measure the resistance according to the value(s) in the table below.
      Fig 3: Inspecting Shift Solenoid Valve ST
      G05400380Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Condition Specified Condition
      Solenoid Connector (ST) - Solenoid Body (ST) 15 to 25°C (59 to 77°F) 11 to 15 Ω

      If the value is not as specified, replace the shift solenoid valve ST.

    2. Connect the positive (+) battery lead to the terminal of the solenoid connector, and the negative (-) battery lead to the solenoid body, and check the operation of the valve.
      NOTE: When using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

      OK: 

      The solenoid makes an operating sound. If the operation cannot be done as specified, replace the shift solenoid valve ST. 

  4. INSPECT SHIFT SOLENOID VALVE SLT 
    1. Measure the resistance according to the value(s) in the table below.
      Fig 4: Inspecting Shift Solenoid Valve SLT
      G05400381Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Specified Condition Specified Condition
      1-2 20°C (68°F) 5.0 to 5.6 Ω

      If the value is not as specified, replace the shift solenoid valve SLT.

    2. Connect the positive (+) battery lead with a 21 W bulb to terminal 2 and the negative (-) battery lead to terminal 1 of the solenoid valve connector, and check the operation of the valve.
      NOTE: When using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

      OK: 

      The solenoid makes an operating sound. If the operation cannot be done as specified, replace the shift solenoid valve SLT. 

  5. INSPECT SHIFT SOLENOID VALVE SL 
    1. Measure the resistance according to the value(s) in the table below.
      Fig 5: Inspecting Shift Solenoid Valve SL
      G05400382Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Specified Condition Specified Condition
      Solenoid Connector (SL) - Solenoid Body (SL) 15 to 25°C (59 to 77°F) 11 to 15 Ω

      If the value is not as specified, replace the shift solenoid valve SL.

    2. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.
      NOTE: When using the battery during the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.

      OK: 

      The solenoid makes an operating sound. If the operation cannot be done as specified, replace the shift solenoid valve SL.