Throttle Body: Installation
- INSTALL THROTTLE BODY ASSEMBLY
- Install a new gasket onto the intake manifold.
- Install the throttle body assembly with the 4 bolts.
Torque: 30 N*m (306 kgf*cm, 22 ft.*lbf)
- Connect the throttle hose.
- Connect the connector.
- Connect the No. 2 water by-pass hose to the throttle body.
- Connect the No. 1 water by-pass hose to the throttle body.
- Connect the No. 2 fuel vapor feed hose.
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH NO. 1 AIR CLEANER HOSE
- Install the air cleaner filter element.
- Install and lock the air cleaner cap sub-assembly and air cleaner hose and then tighten the No. 1 air cleaner hose clamp.
- Connect the No. 2 fuel vapor feed hose.
- Connect the No. 2 ventilation hose to the air cleaner hose.
- Install the vacuum switching valve assembly.
- Connect the mass air flow meter connector.
- Install the wire harness.
- ADD ENGINE COOLANT (See REPLACEMENT )
- INSPECT FOR COOLANT LEAK (See ON-VEHICLE INSPECTION )
- INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
- Install the cover with the 2 nuts.
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
- Install the cover with the 2 nuts.