2AZ-FE Starting: Starter: Installation
- INSTALL STARTER ASSEMBLY
- Install the starter with the 2 bolts.
Torque: 37 N*m (380 kgf*cm, 27 ft.*lbf)
- Connect the starter wire with the nut.
Torque: 9.8 N*m (100 kgf*cm, 7 ft.*lbf)
- Cover the terminal cap.
- Connect the starter connector.
- Install the starter with the 2 bolts.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see INITIALIZATION
).