Installation Procedure
- Install the generator battery control module (2).
- Install the generator battery control module bolts (1).
Tighten: Tighten the bolts to 8 N.m (71 lb in).
- Position the generator battery temperature sensor wiring harness and the battery cables to the generator control module.
- Connect the generator battery temperature sensor wiring harness electrical connectors (5, 6) to the generator control module.
- Install the battery cable (4), and the generator battery control module nut (3) to the stud.
Tighten: Tighten the nut to 8 N.m (71 lb in).
- Install the battery cable (2), and the generator battery control module nut (1) to the stud.
Tighten: Tighten the nut to 8 N.m (71 lb in).
- Install the 3 small wire terminal leads to the batteries.
- Install the generator battery cable leads (3, 4, 5) to the batteries.
- Install the generator battery cable nuts (2).
Tighten: Tighten the nut to 8 N.m (71 lb in).
- Install the generator battery terminal covers (1).
- Install the generator battery cover.
- Install the 12 generator battery cover bolts (1).
Tighten: Tighten the bolts to 8 N.m (71 lb in).
- Install the 2 generator battery fan bolts (2).
Tighten: Tighten the bolts to 8 N.m (71 lb in).
- Install the generator battery wiring harness to the clip (3) on the generator battery cover.
- Install the generator battery carrier. Refer to Generator Battery Carrier Replacement .
- Connect the hybrid battery. Refer to Hybrid Battery Service Disconnect/Connect .
NOTE:
Refer to Fastener Notice
.