Installation Procedure
Courtesy of GENERAL MOTORS CORP.
- Install the ECM (2) to the ECM bracket.
- Install the ECM bracket (1) to the battery hold down bracket.
Courtesy of GENERAL MOTORS CORP.
- Install the 36 volt positive battery cable retainer (4) to the ECM bracket.
Courtesy of GENERAL MOTORS CORP.
- Connect the engine wiring harness electrical connectors (2) to the ECM.
Courtesy of GENERAL MOTORS CORP.
- Connect the body wiring harness electrical connector (1) to the ECM.
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (2.4L (LAT))
.
- Install the generator battery control module cover. Refer to Generator Battery Control Module Cover Replacement
.
- Program the ECM. Refer to Control Module References
.