Installation Procedure
- Install the stationary window (2) into the opening. Refer to Adhesive Installation of Bodyside Stationary Windows .
- Install the sliding door garnish molding. Refer to Rear Side Door Garnish Molding Replacement in Doors.
- Remove the double layer of masking tape around the perimeter of the painted surfaces (1).
- Vent the front door windows until the sliding door window urethane has cured.
- Install either the 40A, RH or LH power sliding door fuse to the I/P fuse block in order to enable the power to the power sliding door motor.
- Perform the re-initialization procedure. Refer to Rear Side Door Actuator Control Module Programming and Setup .
- Close the sliding door.