Installation Procedure
- Clean and dry the area before installing new seals.
- Install the lower seals into position.
- Install the coolant bridge.
- Install the upper seals into position.
- Install the coolant bridge bolt.
Tighten: Tighten the coolant bridge bolt to 30 N.m (22 lb ft).
- Connect the electrical connector at the coolant bridge.
- Connect the coolant hoses at the coolant bridge.
- Install the intake manifold. Refer to Intake Manifold Replacement in Engine Mechanical - 3.0L.
- Connect the negative battery cable.
Tighten: Tighten the battery terminal bolt to 17 N.m (13 lb ft).
- Fill the coolant. Refer to Draining and Filling Cooling System .
NOTE:
Refer to FASTENER NOTICE
in Cautions and Notices.