LEMON Manuals: Even more car manuals for everyone
Home >> Saab >> 2008 >> 9-7X Aero >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Shift Lock Control >> Diagnostic Information and Procedures >> Transmission Control Lever Malfunction >> Component Testing

Component Testing

  1. Install a 10A fused jumper wire from 12 volts to the automatic transmission shift lock actuator control circuit terminals B and E. Momentarily connect a jumper wire from ground to terminal A.
  2. Listen for the solenoids to turn ON and OFF.
    • If the function does not perform as specified, replace the automatic transmission shift lock actuator.