LEMON Manuals: Even more car manuals for everyone
Home >> Saab >> 1973 >> 95 Not Available Trans >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> SAAB Engines >> Torque Specifications

Torque Specifications

TIGHTENING SPECIFICATIONS

Application Ft. Lbs. (mkg)
Main Bearing Cap 72 (9.9)
Connecting Rod 25 (3.4)
Crankshaft Gear 36 (4.9)
Flywheel-to-Crankshaft 50 (6.9)
Camshaft Thrust Plate 15 (2.0)
Camshaft Gear 36 (4.9)
Cylinder Head in Three Stages
  Stage 1 40 (5.5)
  Stage 2 50 (6.9)
  Stage 3 68 (9.3)
Intake Manifold up-to and incl. Chassis No. 95/66, 249 96/524.379 in 2 Stages.
  Stage 1 Bolts 3-6 (.4-.8)
  Stage 2 Bolts 16-21 (2.2-2.9)
  Stage 1 Nuts 2-4 (.3-.4)
  Stage 2 Nuts 11-13 (1.5-1.7)
From Chassis No. 95/66.250, 96/524.380
  Stage 1 Bolts & Nuts 3-6 (.4-.8)
  Stage 2 Bolts & Nuts 15-18 (2.0-2.4)
Intermediate Plate-to-Block 15 (2.0)
Timing Cover 15 (2.0)
Water Pump 7 (.9)
Pulley-to-Balance Shaft 36 (4.9)
Oil Pump-to-Block 11 (1.5)
Oil Pan 4 (.5)
Thermostat Housing 15 (2.0)
Valve Cover 4 (.5)
Rocker Shaft Bracket 32 (4.4)