Installing Pcm Display And Operator Control Unit
Information
Always comply with the regulations for handling ESD-sensitive components!
- Always wear approved work clothes and shoes when carrying out assembly work.
- Do not remove new part from ESD (electrostatic discharge) protective packaging until shortly before installation and only at the installation position.
- Do not touch electric pins and plug contacts.
- Installation is performed in reverse order.
- Screw in and tighten screws > Tightening torque 5.6 Nm (4.1 ftlb.)