Installing Glow Control Unit
- Insert glow control unit into the plenum panel E-box.
- Installation is performed in reverse order to removal.
- Tighten fastening screws securing cover to fuse box housing. → Tightening torque: 3.5 Nm (2.5 ftlb.)
- Tighten fastening screws securing filler neck to the body. → Tightening torque: 7 Nm (5 ftlb.)