Circuit/System Testing
- Ignition OFF, remove the fuse that supplies B+ to terminal X2-56 of the ECM.
- Disconnect the FTP Sensor harness connector.
- Test for less than 5.0 ohms between the low reference circuit terminal E and ground.
- If greater than the specified range, test the low reference circuit for an open/high resistance. If the circuit/connections test normal, replace the ECM.
- Install the fuse that supplies B+ to terminal X2-56 of the ECM.
- Ignition ON, test for 4.8-5.2 volts between the 5-volt reference circuit terminal C and ground.
- If less than the specified range, test the 5-volt reference circuit for a short to ground or open/high resistance. If the circuit/connections test normal, replace the ECM.
- If greater than the specified range, test the 5-volt reference circuit for a short to voltage. If the circuit/connections test normal, replace the ECM.
- Observe the scan tool FTP sensor parameter. Verify that the FTP Sensor parameter is less than 4.8 volts
- If greater than the specified value, test the signal circuit for a short to voltage. If the circuit/connections test normal, replace the ECM.
- Install a 3A fused jumper wire between the signal circuit terminal B and the 5-volt reference circuit terminal C. Verify that the scan tool FTP Sensor parameter is greater than 4.8 volts.
- If less than the specified value, test the signal circuit for a short to ground or an open/high resistance. If the circuit/connections test normal, replace the ECM.
- If all circuits/connections test normal, test or replace the FTP sensor.