Installation Procedure
- Install the O-ring seal (3) to the VSS (2).
- Install the VSS (2) to the transmission.
- Install the VSS bolt (1).
Tighten: Tighten the bolt to 17 N.m (13 lb ft).
- Connect the VSS electrical connector (2).
- Install the front floor closeout panel. Refer to Floor Panel Tunnel Panel Front Closeout Panel Replacement .
- Lower the vehicle.
NOTE:
Refer to Fastener Notice
.