Installation Procedure
- Position the radiator and fan shroud assembly.
Tighten: Tighten the radiator bolts to 19 N.m (14 lb ft).
- Connect the 2 fan motor electrical harness clamps to the fan shroud.
- Connect the fan motor electrical connector.
- If equipped with an air pump:
- Install the 2 bolts to the air pump outlet pipe (2).
Tighten: Tighten the air pump outlet pipe bolts to 7 N.m (62 lb in).
- Connect the 2 hoses to the air pump outlet pipe (1).
- Install the 2 bolts to the air pump outlet pipe (2).
- Connect the transmission oil cooler lines.
- Install the radiator outlet hose. Refer to Radiator Hose Replacement - Outlet .
- Install the radiator inlet hose. Refer to Radiator Hose Replacement - Inlet .
- Refill the cooling system. Refer to Draining and Filling Cooling System .
- Connect the negative battery cable.
- Start and run the engine until the coolant is at operating temperature.
- On vehicles with an automatic transmission, check the transmission fluid level.
- Tighten any loose connections, as necessary.
NOTE:
Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
CAUTION:
Refer to Battery Disconnect Caution
in Cautions and Notices.
IMPORTANT:
Watch for a potential overheating condition while the engine is operating with the radiator cap off.