LEMON Manuals: Even more car manuals for everyone
Home >> Pontiac >> 2004 >> Vibe Base, FWD, Automatic >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Repair Instructions >> Battery Positive Fuse Block Cable Replacement >> Installation Procedure

Installation Procedure

    Fig 1: Grounding Nuts, Bolts, And Battery Cables
    GM830260Courtesy of GENERAL MOTORS CORP.
  1. Position the battery positive fuse block feed cable into the vehicle.
  2. Install the battery positive fuse block feed cable to the under hood fuse block.
  3. NOTE: Refer to Fastener Notice in Cautions and Notices.
  4. Install the battery positive fuse block feed cable to positive (+) battery cable. Secure with the nut (5).

    Tighten:  Tighten the positive (+) battery cable-to- relay block 1 feed cable retaining nut to 9 N.m (78 lb in).

  5. Tape the loom to prevent dirt and moisture from entering the harness.
  6. Install the positive (+) battery cable harness loom to the harness retainers.
  7. Install the plastic insulator to the positive (+) battery cable.
  8. Install the battery to the vehicle. Refer to Battery Replacement .