Installation Procedure
- Install the starter motor shield, if necessary.
- Lift the starter motor into position.
- Install the positive cable lead (4).NOTE: Refer to Fastener Notice in Cautions and Notices.
- Install the positive battery cable nut (3) at the starter solenoid.
Tighten: Tighten the positive battery cable nut at the starter solenoid to 10 N.m (89 lb in).
- The starter lead is wrapped with heat protective tape.
- The starter lead does NOT contact the positive cable and/or connection.
- Install the wiring harness starter lead and washer.
- Install the wiring harness starter lead nut.
Tighten: Tighten the wiring harness starter lead nut to 2 N.m (18 lb in).
- Raise the starter motor to the engine block.
- Install the starter motor bolts.
Tighten: Tighten the starter motor bolts to 50 N.m (37 lb ft).
- Install the left side catalytic converter.
- Lower the vehicle.
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure .
IMPORTANT:
Ensure the following when installing the starter lead: