Installation Procedure
- Install the positive cable to the harness conduit.
- Install the positive cable nut (3) at the starter solenoid.
Tighten: Tighten the positive cable nut at the starter solenoid to 10 N.m (89 lb in).
- Install the positive cable to the generator:
- Install the positive cable to the stud.
- Install the positive cable nut at the generator.
Tighten: Tighten the positive cable nut at the generator to 10 N.m (89 lb in).
- Slide the boot over the generator stud.
- Install the positive cable cover to the cable.
- Install the positive cable to the stud on the fuseblock:
- Install the positive cable to the stud.
- Install the positive cable nut at the fuseblock.
Tighten: Tighten the positive cable nut at the fuseblock to 14 N.m (10 lb ft).
- Close the positive cable cap.
- Install the battery. Refer to Battery Replacement .
NOTE:
Refer to Fastener Notice in Cautions and Notices.