Installation Procedure
- Install both ends (1,3) of the shift lock control solenoid (2) to pivot points.
- Connect the electrical connector (4) to the shift lock control solenoid (2).
- Install the center console. Refer to Console Replacement - Front Floor in Instrument Panel, Gages and Console.