LEMON Manuals: Even more car manuals for everyone
Home >> Plymouth >> 1993 >> Sundance Base, 4D Hatchback, 2.2 D, Automatic >> Repair and Diagnosis (Single Page) >> Brakes >> Traction Control >> Anti-Lock Brake System - BENDIX-6 >> Bleeding Brake System >> Bleeding Modulator Assembly

Bleeding Modulator Assembly

CAUTION: Ensure manual or pressure bleeding procedure is performed before bleeding modulator assembly.
  1. To gain access to 4 bleed screws located on top of modulator assembly, remove battery, battery tray and acid shield. Connect battery to vehicle using jumper cables.
  2. Ensure all fluid lines are installed and correctly torqued. Bleed base brake system using standard pressure or manual procedures.
  3. Connect DRB-II to Blue 6-pin CCD data link connector, located behind fuse access cover on lower section of dash panel, left of steering column. See Fig 1 and Figure .
  4. Using DRB-II, ensure CAB has no fault messages stored. If fault messages are stored, erase messages using DRB-II.
    Fig 1: Locating CCD Data Link Connector
    G92B03546Courtesy of CHRYSLER CORP.
    NOTE: If system is pressure bled, use only diaphragm-type equipment to prevent air, moisture and other contaminants from entering system.
    WARNING: When bleeding modulator assembly, wear safety glasses. Attach bleed tube to bleed screws to direct fluid away from painted surfaces. High-pressure brake fluid comes out when bleed screws are opened.
  5. Install bleed tube on secondary sump bleed screw. See Fig 2 . Using a pressure bleeder, or with an assistant applying constant light pressure on brake pedal, loosen secondary sump bleed screw. Using DRB-II, select ACTUATE VALVES test mode and actuate LF BUILD/DECAY VALVE. Bleed until clear, air-free fluid comes out of secondary sump bleed screw or until brake pedal bottoms.
  6. Tighten bleed screw, and release brake pedal. If pedal pressure is used, repeat bleeding procedure until clear, air-free fluid comes out of bleed screw. Using DRB-II, select and actuate RR BUILD/DECAY VALVE. Repeat bleeding procedure until clear, air-free fluid comes out of secondary sump bleed screw.
  7. Install bleed tube on primary sump bleed screw. See Fig 2 . Using DRB-II, select ACTUATE VALVES test mode and actuate RF BUILD/DECAY VALVE. Using a pressure bleeder, or with an assistant applying constant light pressure on brake pedal, loosen primary sump bleed screw. Bleed until clear, air-free fluid comes out of primary sump bleed screw or until brake pedal bottoms.
  8. Tighten bleed screw, and release brake pedal. If pedal pressure is used, repeat bleeding procedure until clear, air-free fluid comes out of bleed screw. Using DRB-II, select and actuate LR BUILD/DECAY VALVE. Repeat bleeding procedure until clear, air-free fluid comes out of primary sump bleed screw.
  9. Install bleed tube on primary accumulator bleed screw. See Fig 2 . Using DRB-II, select ACTUATE VALVES test mode and actuate RF/LR ISOLATION VALVE. Using a pressure bleeder, or with an assistant applying constant light pressure on brake pedal, loosen primary accumulator bleed screw. Bleed until clear, air-free fluid comes out of primary accumulator bleed screw or until brake pedal bottoms.
  10. Tighten bleed screw and release brake pedal. If pedal pressure is used, repeat bleeding procedure until clear, air-free fluid comes out of bleed screw. Using DRB-II, select and actuate RF BUILD/DECAY VALVE. Repeat bleeding procedure until clear, air-free fluid comes out of primary accumulator bleed screw.
  11. Install bleed tube on secondary accumulator bleed screw. See Fig 2 . Using DRB-II, select ACTUATE VALVES test mode and actuate LF/RR ISOLATION VALVE. Using a pressure bleeder, or with an assistant applying constant light pressure on brake pedal, loosen secondary accumulator bleed screw. Bleed until clear, air-free fluid comes out of secondary accumulator bleed screw or until brake pedal bottoms.
  12. Tighten bleed screw, and release brake pedal. If pedal pressure is used, repeat bleeding procedure until clear, air-free fluid comes out of bleed screw. Using DRB-II, select and actuate LF BUILD/DECAY VALVE. Repeat bleeding procedure until clear, air-free fluid comes out of secondary accumulator bleed screw.
Fig 2: Modulator Assembly Bleeding Sequence
G91G10948Courtesy of CHRYSLER CORP.