Test NF-9A - Checking Engine Controller Ground & Power Circuits
NOTE:
For connector terminal identification, see CONNECTOR IDENTIFICATION DIRECTORY
. For appropriate wiring diagram, see WIRING DIAGRAMS
at end of article.
- Turn ignition switch to OFF position. Disconnect and inspect SBEC connector terminals. Repair connector terminals if damaged. Perform VERIFICATION PROCEDURE VER-2.
- If connector terminals are okay, place DRB-II in ohmmeter mode. Probe SBEC connector terminal No. 5 (Black/White wire). If resistance is more than one ohm, repair Black/White wire for an open to ground. Perform VERIFICATION PROCEDURE VER-2. If resistance is less than one ohm, probe terminal No. 11.
- If resistance is more than one ohm, repair Black/Tan wire for an open to ground. Perform VERIFICATION PROCEDURE VER-2. If resistance is less than one ohm, probe SBEC connector terminal No. 12 (Black/Tan wire). If resistance is more than one ohm, repair Black/Tan wire for an open to ground. Perform VERIFICATION PROCEDURE VER-2.
- If resistance is less than one ohm, place DRB-II in voltmeter mode. Turn ignition switch to ON position. Probe SBEC connector terminal No. 9 (Dark Blue wire). If voltage is less than 10 volts, repair open Dark Blue wire. Perform VERIFICATION PROCEDURE VER-2. If voltage is more than 10 volts, reconnect SBEC connector. Test is complete.