Installation Procedure
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2005 Isuzu Ascender, 2005 GMC Envoy XUV, 2005 GMC Envoy XL, 2005 GMC Envoy, and 2005 Chevrolet TrailBlazer. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT:
- The negative battery cable must not be connected to the battery prior to the installation of the engine harness ground terminal to the engine block.
- The negative battery cable must not be connected to the battery prior to the installation of the instrument panel harness and the engine harness to the powertrain control module.
- Install the cable to the engine harness conduit.
- Install the ground terminal bolt to the engine block.
Tighten: Tighten the bolt to 50 N.m (37 lb ft).
- Install the ground cable clip to the shock tower.
- Install the ground cable bolt (4) that secures the harness to the shock tower.
Tighten: Tighten the bolt to 10 N.m (89 lb in).
- Install the ground terminal bolt (3) that secures the harness to the front fender.
Tighten: Tighten the bolt to 10 N.m (89 lb in).
- Connect the negative battery cable (5). Refer to Battery Negative Cable Disconnect/Connect Procedure .
NOTE:
Refer to Fastener Notice
in Cautions and Notices.