Installing Pressure Gauge
NOTE:
Before connecting pressure gauge, hydraulic accumulator must be depressurized. With ignition off, pump brake pedal a MINIMUM of 20 times using full pedal strokes. When a definite increase in pedal effort is felt, pump pedal 2 more times.
Some diagnostic procedures require that a pressure gauge be connected to the energy unit to read accumulator pressure. Use the following procedure:
- Depressurize accumulator. Remove pressure hose fitting (banjo bolt) from pump body. Take care not to drop the 2 "O" ring seals when removing fitting.
- Install one of the 2 "O" ring seals on pressure gauge fitting and insert gauge fitting into pressure hose coupling.
- Install second "O" ring seal on gauge fitting on the underside of pressure hose coupling and thread gauge fitting into pump body. Tighten fitting to 15 ft. lbs. (20 N.m).
- When removing gauge and installing pressure fitting, inspect "O" ring seals for cuts or damage. Replace any cut or damaged "O" ring seals.