LEMON Manuals: Even more car manuals for everyone
Home >> Oldsmobile >> 1977 >> Custom Cruiser 5.7L Eng VIN L >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
V8,350CID Eng,Eng VIN L11.7A
Additional Procedure: VALVE: Grind Complete:
V8, Where Air Cond interferes add0.5A
V8, Where Air Pump interferes add0.3A
w/Aux Vacuum Pump add0.30.3A
Where Air Cond interferes add0.5A
Where Air Pump interferes add0.3A
Where Cruise Control interferes add0.2A
Where Elect Eng System interferes add0.5A
Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble:
Both0.6B
One Side0.3B
Combination Procedure: ROCKER ARM STUD: Remove & Replace:
Each Additional0.2B
One0.3B
Combination Procedure: VALVE LIFTERS: Remove & Replace:
V80.5B
Combination Procedure: VALVE LIFTERS (REMOVED): Clean:
Each Additional0.1B
One0.2B
Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct:
Per 3 Springs0.2A