LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2023 >> Z Performance, Automatic Trans >> Repair and Diagnosis >> Electrical >> Charging Systems >> Charging System >> Basic Inspection >> Charging System Preliminary Inspection >> Inspection Procedure

Inspection Procedure

  1. CHECK BATTERY TERMINALS CONNECTION 

    Check if battery terminals are clean and tight. Is the inspection result normal?

    YES>>

    GO TO 2.

    NO>>

    Repair battery terminals connection.

  2. CHECK FUSE 

    Check for blown fuse.

    Power source (Power supply terminals) Fuse No. Capacity
    Battery ("S" terminal) 69 10 A
    Ignition switch ON ("L" terminal) 11 5 A

    Is the inspection result normal?

    YES>>

    GO TO 3.

    NO>>

    Be sure to eliminate the cause of malfunction before installing new fuse.

  3. CHECK GROUND CONNECTION 

    Check if alternator ground is clean and tight. Is the inspection result normal?

    YES>>

    GO TO 4.

    NO>>

    Repair ground connection.

  4. CHECK DRIVE BELT TENSION 

    Check drive belt tension. Refer to Inspection . Is the inspection result normal?

    YES>>

    INSPECTION END

    NO>>

    Repair as needed.