LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2017 >> Juke SL, FWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Basic Inspection >> Charging System Preliminary Inspection >> Inspection Procedure

Inspection Procedure

  1. CHECK BATTERY TERMINALS CONNECTION

    Check if battery terminals are clean and tight.

    Is the inspection result normal?

    YES 

    GO TO STEP 2  .

    NO 

    Repair battery terminals connection.

  2. CHECK FUSE

    Check for blown fuse and fusible link.

    Unit Power source (Power supply terminals) Fuse No.
    Alternator Battery ("S" terminal) 35
    Combination meter Ignition switch ON ("L" terminal) 5

    Is the inspection result normal?

    YES 

    GO TO STEP 3  .

    NO 

    Be sure to eliminate the cause of malfunction before installing new fuse.

  3. CHECK "E" TERMINAL CONNECTION (ALTERNATOR GROUND)

    Check if "E" terminal (alternator ground) is clean and tight.

    Is the inspection result normal?

    YES 

    GO TO STEP 4  .

    NO 

    Repair "E" terminal (alternator ground) connection.

  4. CHECK DRIVE BELT TENSION

    Check drive belt tension. Refer to INSPECTION (For NISMO RS models) or INSPECTION (Except for NISMO RS models).

    Is the inspection result normal?

    YES 

    INSPECTION END

    NO 

    Repair as needed.