LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2014 >> Versa SL >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System (Diagnostic Codes & Symptom Tests) >> Periodic Maintenance >> Ignition Timing >> Inspection

Ignition Timing: Inspection

  1. CHECK IGNITION TIMING 
    1. Attach timing light (A) to loop wire (1) as shown below.
      Fig 1: Identifying Ignition Timing Light And Loop Wire
      G09614612Courtesy of NISSAN NORTH AMERICA, INC.
    2. Check ignition timing.
      Fig 2: Identifying Ignition Timing Indicator
      G09614613Courtesy of NISSAN NORTH AMERICA, INC.

      : INSPECTION END