LEMON Manuals
: Even more car manuals for everyone
Home
>>
Nissan-Datsun
>>
2014
>>
Versa Note S, Automatic CVT Trans
>>
Repair and Diagnosis
>>
Engine Performance
>>
System
>>
Engine Control System (Diagnostic Codes & Symptom Tests)
>>
Periodic Maintenance
>>
Ignition Timing
>>
Inspection
Ignition Timing: Inspection
CHECK IGNITION TIMING
Attach timing light (A) to loop wire (1) as shown in the figure.
Fig 1: Attaching Timing Light To Loop Wire
Courtesy of NISSAN NORTH AMERICA, INC.
Check ignition timing.
Fig 2: Identifying Timing Indicator
Courtesy of NISSAN NORTH AMERICA, INC.
: INSPECTION END