  1. CHECK BLOWER RELAY
    1. Turn blower switch OFF.
    2. Remove blower relay.
    3. Check the continuity between blower relay terminals.
      TERMINAL CONTINUITY REFERENCE CHART

      Terminals Condition Continuity
      3 and 5 12 V direct current supply between terminals 1 and 2 Existed
      No current supply Not existed

      Is the inspection result normal? 

      YES: INSPECTION END

      NO: Replace blower relay

      Fig 1: Blower Relay Circuit