Diagnosis Procedure: Notes
WARNING: This page is about a different variant/trim than selected.
- CHECK INPUT SIGNAL
With CONSULT-III
- Start engine.
- Select "MAIN SIGNALS" in "DATA MONITOR" mode for "TRANSMISSION" with CONSULT-III.
- Read out the value of "ISOLT3".ITEM CONDITION CHART
Item name Condition Display value (Approx.) ISOLT3 Secondary pressure low -
Secondary pressure high0.8 - 0.0 A
Without CONSULT-III
- Start engine.
- Check voltage between TCM connector terminal and ground.VOLTAGE SPECIFICATION
Name Connector Terminal Condition Voltage (Approx.) Secondary pressure solenoid valve E31 2 - ground Release your foot from the accelerator pedal. 5.0 - 7.0 V Press the accelerator pedal all the way down. 3.0 - 4.0 V - Turn ignition switch OFF.
- Disconnect TCM connector.
- Check if there is continuity between connector terminal and ground.
OK or NG
OK: GO TO 5.
NG: GO TO 2.
- CHECK SECONDARY PRESSURE SOLENOID VALVE CIRCUIT
- Turn ignition switch OFF.
- Disconnect TCM connector.
- Check resistance between TCM connector terminal and ground.RESISTANCE REFERENCE
Solenoid valve Connector Terminal Resistance (Approx.) Secondary pressure solenoid valve E31 2 - Ground 3 - 9 Ω
OK or NG
OK: GO TO 5.
NG: GO TO 3.
- CHECK VALVE RESISTANCE
- Turn ignition switch OFF.
- Disconnect CVT unit harness connector.
- Check resistance between CVT unit harness connector terminal and ground.RESISTANCE REFERENCE
Solenoid valve Connector Terminal Resistance (Approx.) Secondary pressure solenoid valve F46 3 - Ground 3 - 9 Ω
OK or NG
OK: GO TO 4.
NG: Repair or replace damaged parts.
- CHECK HARNESS BETWEEN TCM AND SECONDARY PRESSURE SOLENOID VALVE
- Turn ignition switch OFF.
- Disconnect TCM connector and CVT unit harness connector.
- Check continuity between TCM connector terminal and CVT unit harness connector terminal.CONTINUITY CHART
Item Connector Terminal Continuity TCM connector E31 2 Yes CVT unit harness connector F46 3 - If OK, check harness for short to ground and short to power.
- Reinstall any part removed.
OK or NG
OK: GO TO 5.
NG: Repair or replace damaged parts.
- CHECK DTC
Perform "DTC CONFIRMATION PROCEDURE ".
OK or NG
OK: INSPECTION END
NG: GO TO 6.
- CHECK TCM
- Check TCM input/output signals. Refer to "TCM TERMINAL AND REFERENCE VALUE ".
- If NG, re-check TCM pin terminals for damage or loose connection with harness connector.
OK or NG
OK: INSPECTION END
NG:
- Repair or replace damaged parts.
- Replace the transaxle assembly. Refer to "REMOVAL AND INSTALLATION ".