LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2011 >> Rogue S, FWD >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System - Component And System Testing - For CALIFORNIA >> Cooling Fan >> Component Inspection (Cooling Fan Relay)

Component Inspection (Cooling Fan Relay)

  1. CHECK COOLING FAN RELAYS
    1. Turn ignition switch OFF.
    2. Remove cooling fan relay. For the relay number, refer to "WIRING DIAGRAM - ENGINE CONTROL SYSTEM - ". For the relay layout, refer to " ENGINE ROOM HARNESS ".
    3. Check the continuity between cooling fan relay terminals under the following conditions.
    CONTINUITY REFERENCE CHART

    Terminals Conditions Continuity
    3 and 5 12 V direct current supply between terminals 1 and 2 Existed
    No current supply Not existed
    Fig 1: Checking Continuity Between Ignition Relay Terminals
    G04889520Courtesy of NISSAN MOTOR CO., U.S.A.

    Is the inspection result normal? 

    YES: INSPECTION END

    NO: Replace cooling fan relay.