LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2011 >> Altima SL >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 81 (Engine Control System - Component Testing (VQ35DE)) >> Fuel Injector >> Component Inspection

Component Inspection

WARNING: This page is about a different variant/trim than selected.
  1. CHECK FUEL INJECTOR
    1. Turn ignition switch OFF.
    2. Disconnect fuel injector harness connector.
    3. Check resistance between fuel injector terminals as per the following.
      RESISTANCE REFERENCE CHART

      Terminals Resistance
      1 and 2 11.1 - 14.5 Ω [at 10 - 60°C (50 - 140°F)]
      Fig 1: Checking Resistance Between Fuel Injector Terminals
      G04875480Courtesy of NISSAN MOTOR CO., U.S.A.

      Is the inspection result normal? 

      YES: INSPECTION END

      NO: Replace malfunctioning fuel injector. Refer to "REMOVAL AND INSTALLATION ".