Diagnosis Procedure
- CHECK INTAKE VALVE TIMING CONTROL SOLENOID VALVE POWER SUPPLY CIRCUIT
- Turn ignition switch OFF.
- Disconnect intake valve timing control solenoid valve (1) harness connector.
- Turn ignition switch ON.
- Check voltage between intake valve timing control solenoid valve terminal 1 and ground with CONSULT-III or tester.
Voltage: Battery voltage
Courtesy of NISSAN MOTOR CO., U.S.A.
OK or NG
OK : GO TO 3.
NG : GO TO 2.
- DETECT MALFUNCTION PART
Check the following.
- Harness connectors E8, F8
- Harness for open or short between intake valve timing control solenoid valve and IPDM E/R
Repair or replace harness or connectors.
- CHECK INTAKE VALVE TIMING CONTROL SOLENOID VALVE OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
- Turn ignition switch OFF.
- Disconnect ECM harness connector.
- Check harness continuity between ECM terminal 73 and intake valve timing control solenoid valve terminal 2. Refer to Wiring Diagram.
Continuity should exist .
- Also check harness for short to ground and short to power.
OK or NG
OK : GO TO 4.
NG : Repair open circuit or short to ground or short to power in harness or connectors.
- CHECK INTAKE VALVE TIMING CONTROL SOLENOID VALVE
Refer to "COMPONENT INSPECTION ".
OK or NG
OK : GO TO 5.
NG : Replace intake valve timing control solenoid valve.
- CHECK INTERMITTENT INCIDENT
Refer to TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT .
INSPECTION END