LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2009 >> 370Z Base, Automatic >> Repair and Diagnosis >> External Pages >> Different car >> Section 65 (Engine Control System - System Diagnostics And Periodic Maintenance) >> Ignition Signal >> Component Function Check

Component Function Check

WARNING: This page is about a different car, the 2010 Nissan 370Z. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSPECTION START

    Turn ignition switch OFF, and restart engine.

    Does the engine start? 

    YES-1: With CONSULT-III: GO TO 2.

    YES-2: Without CONSULT-III: GO TO  3.

    NO: Go to "DIAGNOSIS PROCEDURE ".

  2. CHECK IGNITION SIGNAL FUNCTION

    With CONSULT-III 

    1. Perform "POWER BALANCE" in "ACTIVE TEST" mode with CONSULT-III.
    2. Make sure that each circuit produces a momentary engine speed drop.

    Is the inspection result normal? 

    YES: INSPECTION END

    NO: Go to "DIAGNOSIS PROCEDURE ".

  3. CHECK IGNITION SIGNAL FUNCTION

    Without CONSULT-III 

    1. Let engine idle.
    2. Read the voltage signal between ECM harness connector terminals under the following conditions with an oscilloscope.
    VOLTAGE SPECIFICATION

    ECM Voltage signal
    + -
    Connector Terminal Connector Terminal
    F101 11 M107 128
    G04886600Courtesy of NISSAN MOTOR CO., U.S.A.
    12
    15
    16
    19
    20
    NOTE: The pulse cycle changes depending on rpm at idle.

    Is the inspection result normal? 

    YES: INSPECTION END

    NO: Go to "DIAGNOSIS PROCEDURE ".