Parking Brake Switch Signal Inspection
- CHECK PARKING BRAKE SWITCH SIGNAL INPUT (COMBINATION METER)
- Turn ignition switch ON.
- Check voltage between combination meter harness connector M24 terminal 24 and ground.CONNECTOR TERMINAL VOLTAGE SPECIFICATION
Terminals Condition Voltage (Approx.) (+) (-) Combination meter connector Terminal M24 24 Ground Parking brake released Battery voltage Parking brake applied 0
OK or NG
OK: Replace combination meter. Refer to "COMBINATION METER ".
NG: GO TO 2.
- CHECK PARKING BRAKE SWITCH CIRCUIT
- Turn ignition switch OFF.
- Disconnect combination meter connector and parking brake switch connector.
- Check continuity between combination meter harness connector (A) and parking brake switch harness connector (B).CONNECTOR TERMINAL CONTINUITY SPECIFICATION
A B Continuity Connector Terminal Connector Terminal M24 24 B24 1 Yes - Check continuity between combination meter harness connector (A) and ground.CONNECTOR TERMINAL CONTINUITY SPECIFICATION
A Ground Continuity Connector Terminal M24 24 No
OK or NG
OK: GO TO 3.
NG: Repair harness or connector.
- CHECK PARKING BRAKE SWITCH
Check parking brake switch. Refer to "PARKING BRAKE SWITCH ".
OK or NG
OK: Check parking brake switch case ground.
NG: Replace parking brake switch.