LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2008 >> Sentra SE-R >> Repair and Diagnosis (Single Page) >> Engine Performance >> Engine Control Systems >> Engine Control System - DTCS P0447 To P0850 (Qr25DE) >> DTC P0850 PNP Switch >> Overall Function Check >> With GST

With GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
    TERMINALS VOLTAGE CHART

    Condition (Shift lever) Voltage V (Known-good data)
    P or N position (CVT)
    Neutral position (M/T)
    Approx. 0
    Except above BATTERY VOLTAGE (11 - 14V)
  3. If NG, go to "DIAGNOSTIC PROCEDURE ".
    Fig 1: Checking Voltage Between ECM Terminal 102 (PNP Switch Signal) And Ground
    G04900583Courtesy of NISSAN MOTOR CO., U.S.A.