LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2008 >> Pathfinder S, RWD >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Control System - Introduction (VQ40DE) >> Basic Inspection >> Inspection And Adjustment >> Idle Speed and Ignition Timing Check >> Ignition Timing >> Method A

Method A

  1. Attach timing light to loop wire as shown.
    Fig 1: Identifying Loop Wire And Timing Light Position
    G04895328Courtesy of NISSAN MOTOR CO., U.S.A.
  2. Check ignition timing.
    Fig 2: Identifying Timing Indicator
    G04895324Courtesy of NISSAN MOTOR CO., U.S.A.