LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2008 >> Altima Base >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Control System - Component Testing (Qr25DE Except Hybrid) (For CALIFORNIA) >> Ignition Signal >> Component Inspection (Condenser-2)

Component Inspection (Condenser-2)

  1. CHECK CONDENSER-2
    1. Turn ignition switch OFF.
    2. Disconnect condenser-2 harness connector.
    3. Check resistance between condenser-2 terminals as follows.
      RESISTANCE SPECIFICATION CHART

      Terminals Resistance
      1 and 2 Above 1 MΩ [at 25°C (77°F)]

    Is the inspection result normal? 

    YES : INSPECTION END

    NO : Replace condenser-2.